The engineered step from liquid fuel to gas — dual-fuel conversion, gas train and metering, and the commercial terms that make the saving contractual rather than hoped for.
We treat conversion as rung 03 of the original agreement. The trigger, the scope, the engineering and the post-conversion price are all defined at signature. When gas becomes available, the step happens on pre-agreed terms.
| Parameter | Specification |
|---|---|
| Trigger | Gas availability, defined at signature |
| Options | Dual-fuel conversion or purpose-built replacement |
| Pricing | Post-conversion rate agreed up front |
| Downtime | Engineered for no interruption to load |
| Position on bridge | Rung 03 |
Frac fleets, drilling and production facilities electrified on bridge fuel rather than field diesel.
Read moreFirm capacity for plants where an outage is measured in scrapped product and missed shipments.
Read moreSpeed to power for training clusters, inference halls and colocation campuses — without a diesel-only bridge.
Read moreSend a load profile, a site location and a required date. We come back with the rung you should start on, the delivered cost at each phase and a schedule we will stand behind.