Rapid Deployment Power

Generation on site and carrying load in weeks — the same speed as a rental diesel deployment, on a fuel that does not box you in.

The Problem

What makes this hard.

  • Every fast power deployment converges on rental diesel, because it is the only equipment class that mobilizes in weeks.
  • That decision is usually made under schedule pressure, before anyone has modelled delivered cost over the real duration.
  • Air permits on diesel plant frequently cap run hours — which is exactly the wrong constraint for a facility trying to ramp.

Our Approach

We mobilize modular reciprocating gensets at diesel speed and run them from hour one on renewable diesel or an HVO blend drawn from our own fuel supply. Same schedule, materially lower emissions intensity, and a contract that already contains the step to gas.

What You Get

Delivered as a service, owned and operated by us.

  • Modular reciprocating units staged, installed and commissioned in phases
  • Medium-voltage distribution, paralleling controls and protection included
  • Renewable diesel or HVO from signature, not diesel-then-maybe-something-else
  • Priced against the realistic duration rather than a daily rental card
  • Rungs 03 and 04 written into the same agreement
ParameterSpecification
Time to first powerTypically 30–90 days, site dependent
EquipmentModular reciprocating gensets, containerised
Phase 1 fuelRenewable diesel / HVO blend
ScopeGeneration, distribution, controls, fuel, O&M
ContractSingle PPA with defined step points