Grid & Utility Support

Capacity relief, peaking and deferral of transmission and distribution investment.

Peaking, deferral, constraint relief
Applications
Modular, relocatable
Deployment
Utility contract or direct-to-load
Structures
Economic, hour by hour
Dispatch
The Pressure

What this sector is up against.

  • Load growth is arriving faster than network reinforcement can be planned, permitted and built.
  • Localized constraints force expensive upgrades to serve a small number of new customers.
  • Peaking capacity is needed for limited hours but must be firm when called.

How We Fit

Modular distributed generation sited at the constraint can defer or avoid network investment entirely. We can own and operate under contract to the utility, or serve the constrained customer directly — whichever resolves the constraint faster.

Typical Deployment

What we usually put on the ground here.

Other Sectors

Put a number on it.

Load profile, site location, required date. We come back with a rung-by-rung plan and a delivered cost at each phase.